Posted on April 15, 2019April 12, 2019 by Catherine ArcolioEngineering Work the dam’s first structural component carefully selected and prepared Like this:Like Loading...
They are so amazing. You can just make out the river in the background. When they fell this tree – it will fall across the river – the first structural piece of their dam and then they will wedge a bunch more beside and under it. Loading... Reply
Amazing
Beavers at work
Whoa! 👁👁🍃
That’s a big tree! There will have to be some team work to haul that to the site.
They are so amazing. You can just make out the river in the background. When they fell this tree – it will fall across the river – the first structural piece of their dam and then they will wedge a bunch more beside and under it.
Break time. Or maybe they went to a tooth sharpener.
Ha!